Replacing old dock stairs

We were recently called out to a site with a dock access stair that had seen better days. It got a lot of use, but by the looks of it, had been neglected from a maintenance standpoint. Enamel paint is a great finish if it is maintained, but when left outside around the salt and high traffic to be found on a dock stair it won’t take long to rust without maintenance.

This stair had the painted stair tread nosings all rusted away to a brittle, porous edge. The stringers and support columns all had given way to rust beyond what was fixable with a repair job.

Dock stairs in need of replacement

Dock stairs in need of replacement

The most economical solution for our customer was to have a replacement set of stairs fabricated and hot dipped galvanized. The cost of repair – cutting the current stairs apart, brush/blasting the existing rust out, cutting steel to weld into deteriorated sections, grinding and painting the product –  all in the field would have taken much more time than having replacement stairs fabricated in the shop and brought out to the site. Furthermore we didn’t want to put a “Band-Aid” on the existing stairs by repairing them, knowing the customer wanted to have something in place to forget about. Fabricating a new stair with a hot dipped galvanized would greatly increase the lifespan of the stairs. There is no touch-up painting required and galvanized products can last 5x as long as painted steel.

 

A-Mezz did a site visit to verify conditions and get the existing stair’s measurements. During the visit it was determined that the floor wasn’t completely level. We made the support columns slotted to allow for minor adjustment in the field. This will be more user friendly than making the stair flat and requiring shimming. We didn’t want to fabricate each leg a different length should they one day move it to a new location or have the floor surface refinished in the future.

 

A-Mezz fabricated and pre-assembled as much of the stair and landing as possible in the shop to minimize the time on site with door access out of service as this was a busy dock entrance door. The existing stairs were demo’d and the new stairs were installed in all one morning.

A-Mezz galvanized steel replacement dock stairs

A-Mezz galvanized steel replacement dock stairs

The customer’s new dock stairs will have a long service life due to the hot dipped galvanized finish. The stairs will be able to tackle snow and ice easily with the bar grating treads, and look attractive for years to come – all at a price that was less than repair.

Fixed Ladder Installation – the process from start to finish

A customer called asking for a safe and secure means of accessing their roof and us to do a fixed ladder installation. They have a building that has multiple tenants and didn’t want to have to go through the tenants’ space every time roof access was needed, so an interior ladder and roof hatch combination was off the table. This happens more often than not either because they don’t have a good location inside to mount the ladder or they don’t want to make a hole in their roof.

We went out for a preliminary site visit to verify what the job would entail. The location that was chosen to mount that ladder at was flat from floor to roof. There were no gutters so we would not have to worry about having to either start and stop the gutter and add another down spout, or add a step across platform at the top of the ladder to keep within OSHA’s requirement of a maximum step across a distance of 12”.

Installation site for caged ladder

Installation site for caged ladder

There was a slight parapet at the top of the wall so we set up the extension ladders to verify that the parapet was under 14”high so we would not need to have a crossover ladder with return on the back. We did elect to modify the walk through handrail to remove the return down to the roof to allow more flexibility with installation. Using the self supported walk through handrail allowed a proper fit regardless of the parapet thickness.

Materials were fabricated and shipped to the jobsite where the installation crew attached the lower and upper ladder sections together with the supplied brackets. Next, the ladder was hooked up and elevated into place by a forklift boom. By securing the ladder a little lower than the top, but well past the weight ½ way point, we were able to safely use a shorter, readily available lift and avoid the added cost of additional machine rental.

Lifting the fixed ladder into position

Lifting the fixed ladder into position

The ladder was also outfitted with the LG6 6’ security ladder rung guard to prevent unauthorized access to the ladder. Once hoisted into place, ½” sleeve anchors were inserted into holes drilled into the block and turned until expanded properly, securing the ladder to the wall. For this ladder 18 anchors were used, distributing the 650# ladder and 300# capacity load to well below the tension and shear values for sleeve anchors with the recommended 1-7/8” minimum embedment and a 4:1 (25%) safety factor. Installation was completed in just one morning by a crew of two.

Completed installation of fixed ladder

Completed fixed ladder installation

Replace stairs in tight fit locations and meet code

Many locations have old stairs that need to fixed or replaced due to age, damage etc. Generally speaking regardless of the code in place when the original stair was made, you will need to update your stair to the current building code (IBC) when you replace stairs.

OSHA staircase, replace stairs

Stair meeting OSHA standards

3404.1 General. Except as provided by Section 3401.4 or this section, alterations to any building or structure shall comply with the requirements of the code for new construction. Alterations shall be such that the existing building or structure is no less complying with the provisions of this code than the existing building or structure was prior to the alteration.

This becomes an issue when stairs are installed in tight locations under codes that vary greatly from today’s current International Building Code (IBC) variants.

Imagine having a 12’ high stair in place with a riser height of 9” and a tread depth of 9”. This stair would have (16) treads, 9”deep for a total run of 11’3”.

If the replacement stairs would be required to meet IBC code (adopted by all of the states) they would now need to have (20) treads, 11” deep for a total run of 18’4”. The IBC stairs would extend 7’1” further than the originally installed stairs.

The increased run and decreased slope can wreak havoc on your facilities if the original stairs stopped right before a hallway (new stairs would extend well into the hallway) or if the stairs are enclosed (new slope would cause head clearance issues with existing structure).

If the above situation applies to you don’t sweat it. The above referenced IBC code section does have an exception that may help

Exceptions:

  1. An existing stairway shall not be required to comply with the requirements of Section 1009 where the existing space and construction does not allow a reduction in pitch or slope.
  2. Handrails otherwise required to comply with Section 1009.12 shall not be required to comply with the requirements of Section 1012.6 regarding full extension of the handrails where such extensions would be hazardous due to plan configuration.

 

Why the exemption for stairs (and possibly ramps, though not specifically called out)? The thinking behind the exemption is that without it, stairs that need to be replaced and are not safe will be neglected and not maintained due to the inability to bring them up to current codes. It is better to have a well maintained stair meeting an earlier code than have a poorly maintained stair that doesn’t meet current codes.

Outdoor Stairs for a Construction Trailer

How to get safe permanent access to a construction trailer

Wooden construction trailer stairs

Temporary wooden construction trailer stairs

Job site construction trailers are used all over. Some are temporarily placed in location and then relocated, and some are permanently stationed. The construction trailers can house offices, tools, machinery, electrical controls and more. Oftentimes, job site trailers will have temporary wooden stairs affixed, like the above photo. But what do you do when the construction trailer is actually in a permanent or semi-permanent location?

assembled metal stairs for construction trailer

Shop assembled job site stairs

We often get calls to fabricate replacement construction trailer stairs to replace temporary wooden steps. The stairs below were used with job site trailer that housed electrical control modules and needed a safe OSHA compliant means of access from two sides.

removable handrail on metal stairs

Close-up of removable handrail option

As the construction trailer had some large control modules inside, we supplied stair landings with handrails that can be unbolted, to allow ample access should any module need to be replaced. The stair railings were welded to the stair stringer to maintain a stiff, wobble-free grabbing surface.   In an effort to help keep costs down on the project, the stairs were supplied with two support columns instead of four. This was achieved by bolting the platform edge of the landing to the existing structure, allowing for less steel to be used and a smaller concrete pad to be poured.

stair landing with grating for snow

Bar grating decking allows dirt and snow to fall through – allowing for a safe, clear walking surface

Construction trailers are generally located outside in work zones, oftentimes lacking paved access to the doors. With that in mind, the stair treads and stair landing surfaces are most commonly constructed from bar grating. Bar grating is inherently self-cleaning; mud, dirt, rain and snow fall through the treads keeping them cleaner and safer to step on. The landing also has toe kick around the non-entry and exit locations. The 4” high toe guard stops tools and other items from being kicked off the landing. It also serves to stop a slipping foot from falling off the landing, potentially preventing a serious injury and employee downtime.

fully assembled construction trailer stair with galvanized finish for corrosion  protection

Construction trailer stair with a galvanized finish for superior corrosion resistance

As for finish, hot dipped galvanized is one of the best, cost effective finishes to use when the stairs will be exposed to the elements. No chipping, peeling or blistering of the coating will happen. In fact, when the hot dipped galvanized surface is scraped to bare steel, it will ‘self-heal’. The zinc rich galvanized surfaces to the sides of the bare metal will sacrifice themselves to protect the base steel until all of the surrounding zinc is consumed. Hot dipped galvanizing also coats 100% of the structure because it is immersed in the zinc solution, as opposed to being painted on, which can miss hard to reach areas.