Using Welded Wire Partition Panels Around Site Obstructions

We were called out to a site that needed a lockable wire partition in their facility. The wire partition needed to split a long, below grade area into two secure and separate partitions. Access to a common entry door and light switch needed to be maintained. The location also had low, uneven ceiling dimensions due to obstructing support beams, conduit, gas lines, etc..

common entrance and light switch with proposed entry way marked out on ground

Common entrance and light switch with proposed entry way marked out on ground

Our welded wire partition system was perfect for this project. Other framed woven and welded systems need to have a custom, factory made panel with exact, framed cutouts. Those require additional engineering costs and manufacturing costs – due to custom setups. They also often have higher material costs as the panels need to have a post at each side of the obstruction to support the custom panels.

A-Mezz welded wire partition allows for cut-outs where necessary to work tight around existing obstructions.

A-Mezz welded wire partition allows for cut-outs where necessary to work tight around existing obstructions.

A-Mezz’s welded wire partition systems feature an unframed, 8 gauge galvanized welded wire panel. The panels are able to be trimmed to length, eliminating the need for custom sizes. This saves on the additional costs associated with doing a one-off on the manufacturing line. The panels can also be notched out around obstructions. This allows a tight, clean look while also providing flexibility in the field to deal with known (and unknown) obstructions.

Cutting a woven wire panel will leave a jagged, unraveling edge. Not only is it not a clean look, but it is an easy way to have a workplace injury if clothing snags on the unraveling wire or an employee is cut by it.   

Cutting a woven wire partition panel produces sharp edges

Cutting a woven wire partition panel produces sharp edges

When we arrived with material for the install, the first thing we did was lay it all out and double check our interferences. The critical locations were all marked – clearing the light switch and ensuring doors are installed where the floor was flat enough to swing freely. With the hump in the floor ensured that we had enough sweep (clearance under the door) to clear the hump, as well as enough overhead clearance to miss any of the low overhead obstructions.

A-Mezz Installed welded wire partition including custom cut-outs to remain tight around site obstructions

A-Mezz Installed welded wire partition including custom cut-outs to remain tight around site obstructions

With our layout all marked we worked from the critical locations out to ensure there would be no issues. A crew of two was able to complete the install in less than a day. This included all of the cut-outs required for a tight fit. The end result was a clean, secure wire partition that allowed the customer flexibility with their open space. Whether used for a tool crib, tennant storage, or machine guarding, A-Mezz can supply you with our welded wire partition, giving you the flexibility of a totally customized system at a much lower price.