{"id":77,"date":"2014-07-07T13:33:54","date_gmt":"2014-07-07T17:33:54","guid":{"rendered":"https:\/\/www.amezz.com\/blog\/?p=77"},"modified":"2014-07-07T13:33:54","modified_gmt":"2014-07-07T17:33:54","slug":"adding-a-platform-above","status":"publish","type":"post","link":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/","title":{"rendered":"Adding a Platform Above an Existing Walled Off Space"},"content":{"rendered":"<div id=\"attachment_81\" style=\"width: 310px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-81\" class=\"size-medium wp-image-81\" src=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1-300x225.jpg\" alt=\"View from the side of the platform showing the cantilevered edge to carry the platform over the existing wall\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1-300x225.jpg 300w, https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1-1024x768.jpg 1024w, https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1-624x468.jpg 624w, https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-81\" class=\"wp-caption-text\">View from the side of the platform showing the cantilevered edge to carry the platform over the existing wall<\/p><\/div>\n<p>By Derick<\/p>\n<p>We were contacted by a customer who had an existing walled off area on their floor that they were using for long-term storage.\u00a0 They were running out of room and asked us to build a platform above it, as well as to span over another adjacent room to expand their storage space.<\/p>\n<p>Overall, the platform was to be 42\u2019 wide x 12\u2019 deep in order to stretch over both rooms.\u00a0 We needed to maintain a 10\u2019 clearance height under the platform to clear their existing walls, and the deck was designed for light storage at 125 lbs per square foot live load, which would accommodate their light shelving storage as well potential future pallet storage for pallets up to 4\u2019x4\u2019 and weighing up to 2000 lbs.<\/p>\n<div id=\"attachment_80\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.2.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-80\" class=\"wp-image-80 size-medium\" src=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.2-300x225.jpg\" alt=\"View from underneath the platform with the columns and OSHA stairs dropping into an existing walled off area\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.2-300x225.jpg 300w, https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.2-1024x768.jpg 1024w, https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.2-624x468.jpg 624w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-80\" class=\"wp-caption-text\">View from underneath the platform with the columns and OSHA stairs dropping into an existing walled off area<\/p><\/div>\n<p>We had to be very careful with the positioning of our columns on this project because the customer didn\u2019t want anything in front of the building that might interfere with their aisle way. We set the mezzanine columns back inside the existing room and extended our deck to the front of the building.\u00a0 Likewise, because the customer wanted to keep the stairs inside the footprint of the platform, the customer requested that we use an OSHA staircase as opposed to an IBC staircase. An IBC stair has a more gradual angle of decent with a 7\u201d maximum rise for every 11\u201d tread and requires an 11\u201d handrail extension at the bottom (or in some locations, such as here in Ohio, 23\u201d) An OSHA staircase with generally has around an 8\u201d rise and 9\u201d treads and does not require handrail extensions at the top and bottom.\u00a0 The IBC staircase would not leave them with sufficient room at the bottom between the handrail extensions and the columns to access the stairs, so the decision to go with OSHA freed up some space for them.<\/p>\n<div id=\"attachment_79\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.3.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-79\" class=\"size-medium wp-image-79\" src=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.3-300x225.jpg\" alt=\"Top of deck view of the platform with unfinished Resindek field cut around customer\u2019s existing ductwork and a 6\u2019 bi-parting swing gate\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.3-300x225.jpg 300w, https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.3-1024x768.jpg 1024w, https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.3-624x468.jpg 624w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-79\" class=\"wp-caption-text\">Top of deck view of the platform with unfinished Resindek field cut around customer\u2019s existing ductwork and a 6\u2019 bi-parting swing gate<\/p><\/div>\n<p>For the decking we used a corrugated roof deck (painted reflective white) and skinned it with an unfinished \u00be\u201d Resindek LD.\u00a0 This gave the customer a nice smooth deck surface up top and was significantly less expensive than a metal deck. The framing was held off the main walls of the building by about 6\u201din order to clear the base plates centered under the columns, to clear some small ducts and an existing building column the customer had running up their building\u2019s primary walls, as well providing the installers with enough room to bolt the framing together. The decking was then run beyond the framing back to the customer\u2019s walls and trimmed in the field by the installers to go around the customer\u2019s existing building column and ductwork.<\/p>\n<div id=\"attachment_78\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.4.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-78\" class=\"size-medium wp-image-78\" src=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.4-300x225.jpg\" alt=\"Top of deck view showing internal OSHA staircase and unfinished Resindek field cut around customer\u2019s existing building column\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.4-300x225.jpg 300w, https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.4-1024x768.jpg 1024w, https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.4-624x468.jpg 624w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-78\" class=\"wp-caption-text\">Top of deck view showing internal OSHA staircase and unfinished Resindek field cut around customer\u2019s existing building column<\/p><\/div>\n<p>The materials were shipped out on a tarped dedicated flatbed, and were delivered the next day.\u00a0 The customer unloaded the materials and staged them indoors near the work area.\u00a0 They cleared out the room that we would be building in, and with no existing roof in the room that would otherwise need to be removed, they were all set for our installers.\u00a0 Installation began on a Monday morning, and everything was wrapped up with another happy customer by lunch on Thursday.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Derick We were contacted by a customer who had an existing walled off area on their floor that they were using for long-term storage.\u00a0 They were running out of room and asked us to build a platform above it, as well as to span over another adjacent room to expand their storage space. Overall, [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,7],"tags":[],"class_list":["post-77","post","type-post","status-publish","format-standard","hentry","category-mezzanines","category-stairs"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Adding a Platform Above an Existing Walled Off Space - A-Mezz Blog<\/title>\n<meta name=\"description\" content=\"platform, mezzanine stairs, internal stairs, walled mezzanine platform, long mezzanine floor, equipment platform, storage mezzanine\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Adding a Platform Above an Existing Walled Off Space - A-Mezz Blog\" \/>\n<meta property=\"og:description\" content=\"platform, mezzanine stairs, internal stairs, walled mezzanine platform, long mezzanine floor, equipment platform, storage mezzanine\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/\" \/>\n<meta property=\"og:site_name\" content=\"A-Mezz Blog\" \/>\n<meta property=\"article:published_time\" content=\"2014-07-07T17:33:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"960\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Derick\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Derick\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/\",\"url\":\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/\",\"name\":\"Adding a Platform Above an Existing Walled Off Space - A-Mezz Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.amezz.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1-300x225.jpg\",\"datePublished\":\"2014-07-07T17:33:54+00:00\",\"author\":{\"@id\":\"https:\/\/www.amezz.com\/blog\/#\/schema\/person\/1ccfe792160954695cea1b8c416f35b5\"},\"description\":\"platform, mezzanine stairs, internal stairs, walled mezzanine platform, long mezzanine floor, equipment platform, storage mezzanine\",\"breadcrumb\":{\"@id\":\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#primaryimage\",\"url\":\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1.jpg\",\"contentUrl\":\"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1.jpg\",\"width\":1280,\"height\":960,\"caption\":\"View from the side of the platform showing the cantilevered edge to carry the platform over the existing wall\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.amezz.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Adding a Platform Above an Existing Walled Off Space\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.amezz.com\/blog\/#website\",\"url\":\"https:\/\/www.amezz.com\/blog\/\",\"name\":\"A-Mezz Blog\",\"description\":\"How to transform poorly used space into valuable square footage.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.amezz.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.amezz.com\/blog\/#\/schema\/person\/1ccfe792160954695cea1b8c416f35b5\",\"name\":\"Derick\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.amezz.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d6e781d0a2880264985f0d87edb96546ebcd67584acf8bed1934baec3b82ff36?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d6e781d0a2880264985f0d87edb96546ebcd67584acf8bed1934baec3b82ff36?s=96&d=mm&r=g\",\"caption\":\"Derick\"},\"sameAs\":[\"https:\/\/www.amezz.com\"],\"url\":\"https:\/\/www.amezz.com\/blog\/author\/derick-fowler\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Adding a Platform Above an Existing Walled Off Space - A-Mezz Blog","description":"platform, mezzanine stairs, internal stairs, walled mezzanine platform, long mezzanine floor, equipment platform, storage mezzanine","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/","og_locale":"en_US","og_type":"article","og_title":"Adding a Platform Above an Existing Walled Off Space - A-Mezz Blog","og_description":"platform, mezzanine stairs, internal stairs, walled mezzanine platform, long mezzanine floor, equipment platform, storage mezzanine","og_url":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/","og_site_name":"A-Mezz Blog","article_published_time":"2014-07-07T17:33:54+00:00","og_image":[{"width":1280,"height":960,"url":"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1.jpg","type":"image\/jpeg"}],"author":"Derick","twitter_misc":{"Written by":"Derick","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/","url":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/","name":"Adding a Platform Above an Existing Walled Off Space - A-Mezz Blog","isPartOf":{"@id":"https:\/\/www.amezz.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#primaryimage"},"image":{"@id":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#primaryimage"},"thumbnailUrl":"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1-300x225.jpg","datePublished":"2014-07-07T17:33:54+00:00","author":{"@id":"https:\/\/www.amezz.com\/blog\/#\/schema\/person\/1ccfe792160954695cea1b8c416f35b5"},"description":"platform, mezzanine stairs, internal stairs, walled mezzanine platform, long mezzanine floor, equipment platform, storage mezzanine","breadcrumb":{"@id":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#primaryimage","url":"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1.jpg","contentUrl":"https:\/\/www.amezz.com\/blog\/wp-content\/uploads\/2014\/07\/3.1.jpg","width":1280,"height":960,"caption":"View from the side of the platform showing the cantilevered edge to carry the platform over the existing wall"},{"@type":"BreadcrumbList","@id":"https:\/\/www.amezz.com\/blog\/adding-a-platform-above\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.amezz.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Adding a Platform Above an Existing Walled Off Space"}]},{"@type":"WebSite","@id":"https:\/\/www.amezz.com\/blog\/#website","url":"https:\/\/www.amezz.com\/blog\/","name":"A-Mezz Blog","description":"How to transform poorly used space into valuable square footage.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.amezz.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.amezz.com\/blog\/#\/schema\/person\/1ccfe792160954695cea1b8c416f35b5","name":"Derick","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.amezz.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d6e781d0a2880264985f0d87edb96546ebcd67584acf8bed1934baec3b82ff36?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d6e781d0a2880264985f0d87edb96546ebcd67584acf8bed1934baec3b82ff36?s=96&d=mm&r=g","caption":"Derick"},"sameAs":["https:\/\/www.amezz.com"],"url":"https:\/\/www.amezz.com\/blog\/author\/derick-fowler\/"}]}},"_links":{"self":[{"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/posts\/77","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/comments?post=77"}],"version-history":[{"count":1,"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/posts\/77\/revisions"}],"predecessor-version":[{"id":82,"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/posts\/77\/revisions\/82"}],"wp:attachment":[{"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/media?parent=77"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/categories?post=77"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.amezz.com\/blog\/wp-json\/wp\/v2\/tags?post=77"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}